- ADDRESS:Wanda Plaza, Jinan, Shandong, China
- Wanda Plaza, Jinan, Shandong, China
- +8617615809553
- info@deruna.com


The WEICHAI WP12 Swing Arm Shaft Assembly (rocker arm shaft assembly) is a precision-engineered valve train component that provides a rigid, lubricated pivot axis for all rocker arms in the WP12 heavy-duty diesel engine cylinder head. This swing arm shaft assembly supports the intake and exhaust rocker arms, distributing pressurized oil to each rocker arm bushing and ensuring smooth valve actuation under all load conditions. As a critical part of the overhead valve system, the WEICHAI WP12 Swing Arm Shaft Assembly is manufactured from case-hardened alloy steel with precision-ground surfaces and integrated oil passages. For genuine replacement parts, always choose verified WEICHAI Engine Parts to guarantee perfect fitment, correct oil flow, and long-term durability across all WP12 engine variants from 336 HP to 550 HP.
The WEICHAI WP12 Swing Arm Shaft Assembly is a hardened steel shaft that serves as the common pivot axis for all intake and exhaust rocker arms mounted on the WP12 engine cylinder head. In the WP12 overhead valve (OHV) engine layout, the camshaft is located in the cylinder block and actuates pushrods that travel upward to the rocker arms. The swing arm shaft assembly provides a rigid, straight mounting surface that ensures all rocker arms pivot on a true axis, maintaining consistent valve lift and timing across all six cylinders. This assembly includes the precision-ground shaft, mounting bolts, locating dowel pins, and seals.
The WEICHAI WP12 Swing Arm Shaft Assembly is manufactured from high-strength alloy steel (42CrMo equivalent) that is case-hardened to achieve a surface hardness of 52-56 HRC while maintaining core toughness to resist bending under valve spring loads. The shaft is precision-ground to a diameter tolerance of f7 with a straightness tolerance of ≤0.02mm over the entire length, ensuring smooth rocker arm rotation without binding. The surface is phosphate-coated for corrosion resistance and features a precision-ground finish of RA 0.4 μm, minimizing friction between the shaft and rocker arm bushings.
The WEICHAI WP12 Swing Arm Shaft Assembly incorporates precision-drilled internal oil passages that receive pressurized engine oil from the cylinder head and distribute it to each rocker arm bushing. This forced lubrication system reduces friction by up to 40% compared to splash-lubricated designs, extending component life and reducing valve train noise. The shaft is secured to the cylinder head using multiple bracket supports (Part No. 1000570243) with mounting bolts torqued to 44-58 N·m in a specified sequence. The assembly is designed to withstand the high-frequency mechanical stress of continuous valve operation at engine speeds up to 2100 RPM, with valve spring loads exceeding 500 N per valve.
Applications for the WEICHAI WP12 Swing Arm Shaft Assembly include Shacman X3000, F3000, X5000 series trucks, Sinotruk HOWO A7, Dongfeng KL heavy-duty trucks, SDLG wheel loaders, XCMG excavators, marine propulsion systems, and stationary generator sets. This swing arm shaft assembly is compatible with WP12 engine power outputs ranging from 336 HP (247 kW) to 550 HP (405 kW) across Euro III, Euro IV, and Euro V emission standards. The assembly is available in two primary OEM variants: 1000570248 (Euro IV/V, later production) and 612630050018 (Euro III, early production). Each genuine WEICHAI WP12 Swing Arm Shaft Assembly carries laser-etched part numbers and production date codes for traceability.
Every genuine WEICHAI WP12 Swing Arm Shaft Assembly is 100% tested for straightness, surface hardness, and oil passage integrity before dispatch. Counterfeit units often lack proper heat treatment and may have inadequate hardness or incorrect oil passage drilling, leading to premature rocker arm bushing wear and valve train noise within 50,000 km of service. Always source from authorized distributors to ensure the swing arm shaft assembly meets WEICHAI’s original drawings, material specifications, and metallurgical standards. The genuine swing arm shaft assembly is also available as part of a complete valve train overhaul kit, which includes the shaft, mounting hardware, rocker arms, pushrods, valve springs, and seals.
| NO. | Part NO | Description |
|---|---|---|
| 1 | 1000570248 | Rocker Arm Shaft Assembly (Euro IV/V, WP12/WP13, Complete with Hardware) |
| 2 | 612630050018 | Rocker Arm Shaft Assembly (Euro III, WP12 Series, Early Production) |
| 3 | 1000570243 | Rocker Arm Bracket / Support (Cylinder Head Mounted) |
| 4 | 1000881645 | Intake Valve Rocker Arm Assembly (Compatible with Swing Arm Shaft) |
| 5 | 612630050109 | Exhaust Valve Rocker Arm Assembly (Compatible with Swing Arm Shaft) |
| 6 | 1248115-00032-001 | Valve Rocker Arm Shaft Screw (Locking Screw for Shaft Mounting) |
| 7 | 1000271249 | Valve Rocker Arm Shaft Screw (Alternative OEM Reference) |
| 8 | BY612639000087 | Coaxial Pin / Dowel Pin for Shaft Alignment |
| 9 | 614050048 | Intake Valve Rocker Arm (Euro III, Compatible with 612630050018 Shaft) |
| 10 | 614050049 | Exhaust Valve Rocker Arm (Euro III, Compatible with 612630050018 Shaft) |
The table above lists the most commonly ordered service parts for the WEICHAI WP12 Swing Arm Shaft Assembly. When rebuilding, always replace the swing arm shaft assembly (Part No. 1000570248 for Euro IV/V engines or 612630050018 for Euro III engines) together with all mounting bolts and dowel pins. Never reuse the shaft bolts — they are torque-to-yield fasteners and must be replaced with new units. The swing arm shaft assembly is manufactured from case-hardened alloy steel with a surface hardness of 52-56 HRC and a straightness tolerance of ≤0.02mm over the entire length.
Our WEICHAI WP12 Swing Arm Shaft Assembly is manufactured from 42CrMo alloy steel with case-hardening to 52-56 HRC surface hardness, ensuring exceptional wear resistance against rocker arm bushings under continuous high-frequency valve operation.
The shaft is precision-ground to a diameter tolerance of f7 with a straightness tolerance of ≤0.02mm over the entire length and a surface finish of RA 0.4 μm, minimizing friction and preventing rocker arm binding.
Precision-drilled internal oil passages distribute pressurized engine oil from the cylinder head to each rocker arm bushing, reducing friction by up to 40% and extending the service life of the entire valve train.
No modifications required for WP12 engines in Shacman (X3000, F3000, X5000), Sinotruk HOWO, Dongfeng, SDLG, XCMG, and other heavy equipment. Bolt-on replacement with factory-specified torque values.
Each WEICHAI WP12 Swing Arm Shaft Assembly undergoes dimensional inspection, hardness testing (52-56 HRC), straightness verification, and oil passage flow testing before dispatch. No defects are tolerated.
We ship worldwide from regional warehouses. Free torque specification charts and installation guidance provided with each order. Volume discounts available for fleet customers and engine rebuilders.
Unlike low-cost alternatives that use unhardened mild steel with inconsistent straightness, our WEICHAI WP12 Swing Arm Shaft Assembly is manufactured from certified 42CrMo alloy steel with documented material certificates. This guarantees consistent hardness distribution (52-56 HRC at the surface, 25-30 HRC core) and thermal expansion behavior matching the original WP12 engine specifications. Independent laboratory testing confirms that our swing arm shaft assembly withstands over 50 million valve actuation cycles without measurable wear or straightness deviation beyond 0.02mm.
Each swing arm shaft assembly includes precision-drilled oil passages with chamfered oil holes to ensure smooth oil flow to each rocker arm bushing. The oil hole spacing is held to a tolerance of ±0.1mm, matching the rocker arm positions on the WP12 cylinder head. The shaft ends are chamfered to prevent seal damage during installation. All mounting bolt holes are threaded with rolled threads (not cut threads) for superior fatigue resistance.
Technical support is available via email with complete installation procedures: clean the shaft oil passages with solvent and compressed air before installation, lubricate the shaft with clean engine oil, torque the bracket mounting bolts to 44-58 N·m in a symmetrical cross tightening sequence, and verify free rotation of all rocker arms before closing the valve cover. We also provide troubleshooting guides for symptoms like valve train noise (worn shaft or rocker bushings) or uneven valve lift (bent shaft). Our goal is to make your WP12 engine valve train restoration straightforward and cost-effective.
For large fleets, we offer sample testing: order one WEICHAI WP12 Swing Arm Shaft Assembly first for trial installation on one engine. If satisfied, volume pricing applies. Many return customers report over 600,000 km of trouble-free valve train operation after replacing worn shafts with our genuine-spec components. We also stock both Euro III variants (612630050018) and Euro IV/V variants (1000570248) to cover all WP12 engine vintages, and we provide cross-reference support for part number verification based on your engine serial number.
Beyond the checklist above, pay attention to engine starting behavior and idle stability. Hard starting or rough idle may indicate incorrect valve timing due to a bent swing arm shaft or worn rocker arm bushings. Perform a cylinder compression test to diagnose; uneven compression across cylinders may point to inconsistent valve lift caused by a warped swing arm shaft or loose bracket supports.
For vehicles operating in dusty environments (mines, quarries, construction sites), clean the crankcase ventilation system every 10,000 hours. Clogged breathers increase crankcase pressure, which can force oil past the valve stem seals, leading to carbon deposits that can clog the swing arm shaft oil holes. Use compressed air to blow out the shaft oil passages during every valve train inspection to ensure unrestricted lubrication flow.
If the engine experiences a valve train failure (broken valve spring, dropped valve), the swing arm shaft assembly must be replaced even if no visible damage is present. The impact load from a valve striking a piston can cause microscopic bending of the shaft that is not detectable with standard measurement tools but will cause accelerated rocker arm wear and valve train noise thousands of kilometers later. Always replace the swing arm shaft assembly and all rocker arms together after any valve-to-piston contact event.
Finally, maintain a logbook of all maintenance actions: dates, valve lash measurements, swing arm shaft straightness readings, oil analysis results, and any abnormal findings. This historical data helps predict when the WEICHAI WP12 Swing Arm Shaft Assembly might need replacement based on actual operating conditions rather than arbitrary mileage intervals. For fleet operators, tracking the trend of iron and chromium levels in used oil analysis is a powerful predictive maintenance tool — accelerating wear rates indicate impending swing arm shaft or rocker arm failure.
In summary, the WEICHAI WP12 Swing Arm Shaft Assembly stands out for its case-hardened alloy steel construction, precision-ground surface finish, and integrated oil distribution passages. Whether you are rebuilding a Shacman X3000, Sinotruk HOWO, SDLG wheel loader, or marine generator, choosing a quality swing arm shaft assembly directly impacts valve train longevity, engine noise levels, and fuel economy. Always verify the part numbers against your engine serial number before ordering — Euro III engines require the 612630050018 shaft assembly, while Euro IV/V engines use the 1000570248 assembly.
For workshops performing in-frame overhauls, we recommend ordering the WEICHAI WP12 Swing Arm Shaft Assembly together with a complete set of intake and exhaust rocker arms (24 pieces), pushrods, valve springs, and valve cover gasket. This approach eliminates hidden failures and gives your customer a worry-free warranty period. The swing arm shaft assembly is pre-inspected for straightness, hardness, and oil passage integrity before shipment.
Our inventory includes both standard compression ratio variants and low-compression (16:1) versions for different emission levels. The standard WEICHAI WP12 Swing Arm Shaft Assembly suits Euro III and Euro IV engines with mechanical unit pumps, while the assembly for Euro V engines features slightly different bracket mounting positions. Select accordingly based on your engine variant and emissions certification. We also provide cross-reference support for part number verification.
We also provide after-sales documentation including dimensional inspection reports (straightness, diameter tolerance, oil hole position), material certificates (including chemical composition and case-hardening depth charts), and hardness test results upon request. Every WEICHAI WP12 Swing Arm Shaft Assembly is packaged in anti-corrosion oil and foam-lined boxes to prevent damage during shipping. Bulk orders receive custom palletizing and export documentation assistance.
All specifications are based on original WEICHAI WP12 engine technical data. Actual product dimensions may vary by sub-model (E3, E5, NG, etc.). Always cross-check part numbers with your engine’s serial number plate. The WEICHAI WP12 Swing Arm Shaft Assembly is a direct replacement for original equipment part numbers 1000570248 (Euro IV/V) and 612630050018 (Euro III). Always replace shaft mounting bolts and clean oil passages before installation.
Related Products
If you have any questions about our products, services, or anything related to what we offer, please don’t hesitate to leave us a message—our dedicated team is always ready to provide prompt and helpful responses to address your concerns. What’s more, when you become our valued customer, we’re delighted to offer you complimentary catalog services, giving you access to detailed, up-to-date information on our full range of products, specifications, and offerings to help you make informed decisions.